Drawing review
Review of panel zones, dimensions, structural interfaces and project constraints.
ENGINEERING & MANUFACTURING
A structured workflow for material selection, component detailing, prototype review, controlled fabrication and international delivery.
Submit your project briefMANUFACTURING SCOPE
Review of panel zones, dimensions, structural interfaces and project constraints.
Material grade and surface finish selection based on application, exposure and project requirements.
Panel form, movement allowance, connection concept and repeatability.
Sample or prototype evaluation before repeat manufacturing.
Forming, finishing, assembly checks and documented inspection points.
Protective packaging, documentation and delivery planning.
PROJECT INPUTS
Useful starting information includes the project location, facade dimensions, elevation or structural drawings, intended appearance, preferred material and anticipated delivery timing.
Final engineering and installation decisions must be coordinated with the responsible project professionals and applicable local requirements.
Comparing potential suppliers? Use the Kinetic Facade Manufacturer Evaluation Guide to review engineering scope, fabrication evidence, quality controls and delivery support.
A concise project brief helps UJIA identify a suitable system direction, missing inputs, prototype needs and the next technical decision.
Early information may be approximate. Final engineering, loads, supports and compliance require coordinated project data and the responsible local professionals.
Send drawings and project information directly to our team.
Discuss manufacturingThis page describes Youjia commercial manufacturing support from approved project information through controlled production and export handover. For independent supplier-comparison criteria, use the linked manufacturer evaluation guide.
| Manufacturing stage | Typical Youjia scope | Required release information | Quality or delivery record |
|---|---|---|---|
| Drawing and interface review | Review panel zones, module logic, supports, movement clearances and repeat components | Current elevations, dimensions, interfaces, responsibility boundaries and revision status | Clarification list and controlled design basis |
| Material and finish confirmation | Confirm quoted grade, thickness, temper, finish reference and corrosion assumptions | Approved material specification, exposure class, colour or texture reference | Material and finish schedule with agreed samples where required |
| Prototype and process validation | Fabricate representative moving components and verify forming, assembly and finish sequence | Prototype scope, acceptance criteria, witnessing parties and approval authority | Inspection observations, revisions and approval record |
| Controlled repeat production | Cut, form, finish, assemble and identify components against released information | Approved drawings, quantities, tolerances, finish, component coding and release date | Production inspection and nonconformance records within the agreed plan |
| Pre-shipment verification | Check quantities, identification, representative movement, finish protection and packing | Approved packing method, spare quantities, shipping marks and destination requirements | Packing list, inspection evidence and shipment-release record |
| Export and handover | Coordinate protective packaging, commercial documents and agreed technical information | Incoterms, consignee, route, unloading limits, storage and local-document requirements | Shipment documents, component references and handover information |
Concept drawings can support feasibility and budget review, but repeat production should begin only after geometry, interfaces, materials, quantities, tolerances and responsibility boundaries are approved and released.
The inspection plan can define material records, approved finish references, dimensional checks, representative movement checks, component identification, nonconformance handling, packing verification and shipment release evidence.
Only when it is specifically included in the commercial and engineering scope. Kinetic panels, movement components, secondary supports, anchors and primary building structure must be listed separately so responsibility is clear.
Numbered modules, component schedules, retained specifications, spare quantities and replacement instructions improve traceability. The final handover scope should state which records and spares are supplied.
Continue with the manufacturer evaluation guide, engineering service, installation guide and project review contact page.