ENGINEERING & MANUFACTURING

From facade intent to repeatable metal components.

A structured workflow for material selection, component detailing, prototype review, controlled fabrication and international delivery.

Submit your project brief

A process built around verification.

01

Drawing review

Review of panel zones, dimensions, structural interfaces and project constraints.

02

Material planning

Material grade and surface finish selection based on application, exposure and project requirements.

03

Component development

Panel form, movement allowance, connection concept and repeatability.

04

Prototype review

Sample or prototype evaluation before repeat manufacturing.

05

Controlled production

Forming, finishing, assembly checks and documented inspection points.

06

Export coordination

Protective packaging, documentation and delivery planning.

What helps us evaluate your requirement.

Useful starting information includes the project location, facade dimensions, elevation or structural drawings, intended appearance, preferred material and anticipated delivery timing.

Final engineering and installation decisions must be coordinated with the responsible project professionals and applicable local requirements.

Comparing potential suppliers? Use the Kinetic Facade Manufacturer Evaluation Guide to review engineering scope, fabrication evidence, quality controls and delivery support.

PROJECT REVIEW INPUTS

What to send UJIA for a useful first review

A concise project brief helps UJIA identify a suitable system direction, missing inputs, prototype needs and the next technical decision.

Early information may be approximate. Final engineering, loads, supports and compliance require coordinated project data and the responsible local professionals.

Ready for a technical review?

Send drawings and project information directly to our team.

Discuss manufacturing

Kinetic Facade Manufacturing Scope and Delivery Controls

This page describes Youjia commercial manufacturing support from approved project information through controlled production and export handover. For independent supplier-comparison criteria, use the linked manufacturer evaluation guide.

Manufacturing stageTypical Youjia scopeRequired release informationQuality or delivery record
Drawing and interface reviewReview panel zones, module logic, supports, movement clearances and repeat componentsCurrent elevations, dimensions, interfaces, responsibility boundaries and revision statusClarification list and controlled design basis
Material and finish confirmationConfirm quoted grade, thickness, temper, finish reference and corrosion assumptionsApproved material specification, exposure class, colour or texture referenceMaterial and finish schedule with agreed samples where required
Prototype and process validationFabricate representative moving components and verify forming, assembly and finish sequencePrototype scope, acceptance criteria, witnessing parties and approval authorityInspection observations, revisions and approval record
Controlled repeat productionCut, form, finish, assemble and identify components against released informationApproved drawings, quantities, tolerances, finish, component coding and release dateProduction inspection and nonconformance records within the agreed plan
Pre-shipment verificationCheck quantities, identification, representative movement, finish protection and packingApproved packing method, spare quantities, shipping marks and destination requirementsPacking list, inspection evidence and shipment-release record
Export and handoverCoordinate protective packaging, commercial documents and agreed technical informationIncoterms, consignee, route, unloading limits, storage and local-document requirementsShipment documents, component references and handover information

Information Required Before Production Release

Manufacturing Service Questions

Can manufacturing begin from concept drawings?

Concept drawings can support feasibility and budget review, but repeat production should begin only after geometry, interfaces, materials, quantities, tolerances and responsibility boundaries are approved and released.

What quality evidence can be agreed for a project?

The inspection plan can define material records, approved finish references, dimensional checks, representative movement checks, component identification, nonconformance handling, packing verification and shipment release evidence.

Does Youjia manufacture the building primary structure?

Only when it is specifically included in the commercial and engineering scope. Kinetic panels, movement components, secondary supports, anchors and primary building structure must be listed separately so responsibility is clear.

How are replacement components supported after delivery?

Numbered modules, component schedules, retained specifications, spare quantities and replacement instructions improve traceability. The final handover scope should state which records and spares are supplied.

Continue with the manufacturer evaluation guide, engineering service, installation guide and project review contact page.